Before anyone breaks ground.

Most of the decisions that determine whether a house lasts are made long before there is anything to look at.

The ground

Engineering is not optional on my projects.

  1. The soil is tested first. Core drillings on the site itself establish the load‑bearing capacity of the ground you are actually building on — not the lot next door, and not an assumption.
  2. The foundation is engineered from that report. An engineer designs it around what the soil can carry: the depth, width and spacing of the footings, the gauge and layout of the reinforcing steel.
  3. The site is prepared to specification. Where fill is required, it is tested for compaction as it goes in — not signed off at the end.
  4. Structural engineering where the spans demand it. When a span exceeds what dimensional lumber can safely carry, it is engineered. Large homes routinely do.
  5. Wind load, engineered in advance. An exposed site — a point of land with open water in front of it — lets a storm gather force across all of that distance before it reaches the walls. That is designed for, before construction begins.
  6. Water is kept out of the foundation. Termite treatment, then a poly barrier, then the steel. Anchor bolts around the full perimeter, so the frame is bolted to the foundation, not resting on it.

Much of this is not required here. I require it. I will not build a home for an owner who is unwilling to pay for the ground to be tested — the cost of finding out later is not measured in dollars.

Custom home by Signature Homes by Wade

Before the estimate

You will know what it costs before we start.

I work with most owners before they have bought the land, or shortly after. I help select the site, work alongside the architect through design, and guide the selections — and I charge nothing for any of that.

Only then do you get an estimate: itemised, line by line, in exhaustive detail. It takes real time to produce, and it is meant to be the number. Not an opening position with change orders waiting behind it.

An estimate handed to you after a couple of hours and a look at the plans is not an estimate. It is a guess, and you will pay for the difference later.

Time

These homes are not built quickly.

The fastest I have built is nine or ten months. Many take a year and a half, or two. It depends on the size of the project — and on how quickly the owners want to make decisions, which is entirely their business, not mine.

Some clients have taken three months simply to settle on their paint. That is fine. I am not going to rush a decision you will live inside for twenty years. If you have a deadline, tell me and I will meet it. If you do not, there is no clock.

Both ways

I choose my clients as carefully as they choose me.

This is not a transaction that ends at the closing. It is a relationship that runs for a year or two of construction, and often for decades afterwards. It has to be one that works.

So I do not take on every project I am offered. I meet the people, and they meet me, and we both decide. Not everyone gets on with me; I am not always the right builder for everyone. It is far better to find that out at the beginning than in month fourteen.